oil filled transformer

Pre-Installation Checks

Foundation and Structural Requirements

Electrical Connections

  • Check for signs of corrosion or damage.
  • Tighten all loose connections with appropriate tools.
  • Use a cloth to wipe away dirt or oil.
  • Ensure no wires are frayed or exposed.
  • Check the integrity of grounding rods and connections.
  • Test grounding resistance with a multimeter.
  • Ensure grounding wires are properly connected to the transformer.
  • Inspect for any signs of wear or damage.
  • Use a multimeter to measure voltage levels.
  • Check phase alignment with system specifications.
  • Ensure transformer is set to the correct tap settings.
  • Consult documentation to verify configuration details.

Oil Filling Process

Cooling System Inspection

Testing and Commissioning

Documentation and Compliance

Post-Installation Monitoring