Your checklists (
0
)
AI Checklist Generator
From the makers of
Manifestly Checklists
Sign in
Email address
Email me a magic link
Home
> on/off valve local panel PM checklist
on/off valve local panel PM checklist
1. Visual Inspection
Check for any signs of leaks around the valve and fittings.
Inspect for corrosion or damage to the valve body and panel.
Ensure all labels and markings are legible and intact.
2. Functional Testing
Verify that the valve opens and closes smoothly without resistance.
Test the local control panel for proper operation.
Check for accurate feedback on the position indicator.
3. Electrical Components
Inspect all wiring for wear, damage, or loose connections.
Test fuses and circuit breakers for proper operation.
Ensure all control switches are functioning correctly.
4. Calibration
Verify the calibration of pressure and flow sensors associated with the valve.
Adjust any necessary settings to ensure accurate readings.
Document calibration results for maintenance records.
5. Lubrication
Apply lubricant to any moving parts as per manufacturer's specifications.
Check for proper lubrication of the actuator mechanism.
Ensure that lubricant used is compatible with the valve materials.
6. Documentation
Record all findings and actions taken during the PM.
Update maintenance logs with any repairs or replacements made.
Schedule next PM based on manufacturer recommendations.
7. Final Inspection
Conduct a final check to ensure all tools and materials have been removed.
Confirm that all safety guards and covers are in place.
Ensure the area around the valve and panel is clean and free of obstructions.
Download CSV
Download JSON
Download Markdown
Use in Manifestly