Piping fabrication & delivery
Preparation Stage
Review project specifications and drawings.
Confirm material requirements and availability.
Assess and procure necessary tools and equipment.
Establish a fabrication schedule.
Fabrication Process
Cut pipes to specified lengths.
Perform beveling and preparation for welding.
Assemble pipe sections as per design.
Execute welding procedures and inspections.
Conduct non-destructive testing (NDT) as required.
Clean and coat pipes for protection.
Quality Control
Inspect fabricated pipes for dimensional accuracy.
Verify weld quality and strength.
Document inspection results and quality assurance measures.
Address any discrepancies or defects found.
Packaging and Delivery
Prepare pipes for transport (padding, crating, etc.).
Label all pipes with identification tags.
Coordinate logistics for delivery to site.
Confirm delivery schedule with stakeholders.
Final Documentation
Compile all fabrication records and certifications.
Provide a final report to project management.
Ensure all documentation is accessible for future reference.
This structured checklist can help ensure a thorough and organized approach to piping fabrication and delivery.