PLC SCADA Instruments Automation Panel Check list
1. Preliminary Checks
Verify the power supply is connected and functioning.
Check for any physical damage to the panel.
Ensure all circuit breakers are in the ON position.
Inspect for proper ventilation around the panel.
2. PLC Functionality
Confirm that the PLC is powered on and running.
Check the status indicators (LEDs) for normal operation.
Review the PLC program for any errors or warnings.
Test the communication between the PLC and SCADA system.
3. SCADA System Verification
Ensure the SCADA software is up-to-date.
Check for the proper configuration of tags and alarms.
Verify the data logging functionality is operational.
Test the alarms and notifications to ensure they are triggered correctly.
4. Instrumentation Checks
Inspect all field instruments for proper installation.
Verify calibration of sensors and transmitters.
Check signal integrity for analog and digital inputs/outputs.
Ensure that all instrument readings are within expected ranges.
5. Wiring and Connections
Inspect all wiring for signs of wear or damage.
Verify that all connections are tight and secure.
Check for proper grounding of the panel and instruments.
Ensure that labeling of wires and components is clear and accurate.
6. Safety and Compliance
Confirm that safety guards and covers are in place.
Check emergency stop buttons and safety interlocks.
Verify compliance with relevant industry standards and regulations.
Ensure proper signage is displayed on the panel.
7. Documentation and Reporting
Review all documentation for accuracy and completeness.
Ensure that maintenance logs are updated.
Document any issues found during the checklist process.
Prepare a report on the checklist findings for record-keeping.
8. Final Review
Conduct a final walkthrough of the panel and instruments.
Ensure all checklist items have been completed.
Sign off on the checklist once all items are verified.
Schedule the next inspection or maintenance date.