Your checklists (
0
)
AI Checklist Generator
From the makers of
Manifestly Checklists
Sign in
Email address
Email me a magic link
Home
> Preliminary Lifting Plan – 200 Ton
Preliminary Lifting Plan – 200 Ton
1. Project Information
Project Name
Project Location
Client Name
Project Manager Contact Information
2. Lifting Details
Load Weight (200 Tons)
Load Dimensions (Length, Width, Height)
Load Shape and Type
Load Center of Gravity
Lifting Method (e.g., crane type, rigging method)
3. Equipment Selection
Crane Type and Model
Crane Capacity
Rigging Equipment (slings, shackles, etc.)
Other Lifting Accessories (blocks, spreaders, etc.)
Equipment Inspection Certificates
4. Site Conditions
Ground Conditions (type, stability)
Weather Conditions (wind speed, visibility)
Proximity to Overhead Hazards (power lines, buildings)
Access Routes for Equipment
5. Personnel Requirements
Qualified Personnel List (crane operators, riggers, signalers)
Training Certifications and Competencies
Safety Briefing Schedule
6. Safety Considerations
Risk Assessment Completed
Emergency Procedures in Place
Personal Protective Equipment (PPE) Requirements
Communication Plan (hand signals, radios)
7. Lifting Procedures
Pre-lift Inspection Checklist
Lift Sequence and Methodology
Load Testing Procedures
Communication Protocol During Lift
8. Post-Lift Procedures
Load Securing Procedures
Incident Reporting and Investigation Procedures
Documentation and Reporting
9. Approval and Sign-off
Plan Prepared By (Name and Signature)
Plan Reviewed By (Name and Signature)
Plan Approved By (Name and Signature)
Date of Approval
Download CSV
Download JSON
Download Markdown
Use in Manifestly