prepare a detailed check sheet for Transformer Manufacturing

I. Raw Material Inspection

II. Core Assembly

III. Winding Process

  • Check machine settings against calibration standards.
  • Clean machine surfaces and components from debris.
  • Verify operation of winding heads and tension controls.
  • Inspect electrical connections for wear or damage.
  • Use a micrometer to measure wire diameter.
  • Cross-reference measurement with design documents.
  • Document any discrepancies and adjust orders accordingly.
  • Ensure wire is free of defects before use.
  • Select appropriate insulation material based on specifications.
  • Apply insulation evenly between layers during winding.
  • Check for air gaps or inconsistencies in insulation.
  • Conduct tests for insulation resistance as required.
  • Set a counter to track the number of turns.
  • Follow design specifications closely during winding.
  • Double-check the count at regular intervals.
  • Record the final count for quality assurance.

IV. Assembly of Components

V. Testing Procedures

VI. Final Assembly and Inspection

VII. Documentation and Reporting

VIII. Maintenance and After-Sales Support