Your checklists (
0
)
AI Checklist Generator
From the makers of
Manifestly Checklists
Sign in
Email address
Email me a magic link
Home
> pressure gauge GA drawing
pressure gauge GA drawing
Preliminary Information
Confirm the project name and number.
Verify the date of the drawing creation.
Ensure the drawing scale is specified.
Gauge Specifications
List the type of pressure gauge (e.g., mechanical, digital).
Verify the pressure range of the gauge.
Confirm the accuracy class of the gauge.
Include the manufacturer's name and model number.
Certainly! Here are additional steps that can be included in the Gauge Specifications section of the pressure gauge GA drawing checklist
Specify the connection type (e.g., threaded, flanged, sanitary)
Identify the process connection size (e.g., 1/4", 1/2")
State the maximum allowable working pressure (MAWP)
Note the environmental conditions (e.g., temperature range, humidity)
Determine the fluid compatibility (e.g., corrosive, non-corrosive)
Indicate the gauge material (e.g., stainless steel, brass, plastic)
Specify the display type (e.g., analog dial, digital LCD)
Detail any special features (e.g., remote reading, adjustable zero)
Confirm the calibration date or schedule for calibration
Include any additional certifications required (e.g., ATEX, IECEx for hazardous areas)
Installation Details
Specify the installation location of the gauge.
Ensure all mounting requirements are listed (e.g., brackets, supports).
Identify the required piping connections and sizes.
Electrical Requirements (if applicable)
Note the power supply requirements (voltage, phase).
Confirm the type of signal output (e.g., 4-20 mA, digital).
Ensure grounding requirements are specified.
Compliance and Standards
Verify adherence to relevant industry standards (e.g., ASME, API).
Include any certifications (e.g., ISO, CE) applicable to the gauge.
Testing and Calibration
Outline the testing procedures for the gauge.
Specify the calibration requirements and intervals.
Documentation and Notes
Include any relevant notes or remarks for installation and operation.
Ensure that all revisions are documented and noted on the drawing.
Approval and Sign-off
Confirm that all necessary approvals are obtained.
Ensure that the drawing is signed by the responsible engineer.
Download CSV
Download JSON
Download Markdown
Use in Manifestly