1. Preparation

  • Review contract documents and engineering plans.
  • Identify specific materials and subgrade thickness.
  • Check for any special testing or monitoring requirements.
  • Confirm compliance with local regulations and standards.
  • Inspect equipment for mechanical issues or wear.
  • Calibrate pressure gauges and measurement devices.
  • Verify tire pressures and operational fluid levels.
  • Conduct a test run to ensure proper functionality.
  • Meet with site supervisors to discuss timelines.
  • Share the planned proof rolling dates with all parties.
  • Ensure availability of necessary personnel and equipment.
  • Confirm communication channels for updates or changes.

2. Site Conditions

3. Equipment Setup

4. Execution of Proof Rolling

5. Observation and Documentation

6. Assessment of Results

7. Follow-Up Actions

8. Final Documentation