Your checklists (
0
)
AI Checklist Generator
From the makers of
Manifestly Checklists
Sign in
Email address
Email me a magic link
Home
> Road Tanker Top Loading Procedure
Road Tanker Top Loading Procedure
Preparation
Verify that the loading area is clear and free from obstructions.
Ensure that all necessary personal protective equipment (PPE) is worn.
Confirm that the tanker is properly grounded to prevent static discharge.
Check that the loading arms and hoses are in good condition and free of leaks.
Documentation
Review the shipping documents for accuracy and completeness.
Ensure that the product being loaded matches the documentation.
Check that the appropriate permits and safety data sheets (SDS) are available.
Equipment Setup
Position the tanker in the designated loading area.
Connect the loading arm to the tanker’s fill point securely.
Open the appropriate valves on the loading arm and tanker.
Ensure that all necessary gauges and meters are functional.
Loading Procedure
Start the loading process according to the facility's operational procedures.
Monitor the loading rate and adjust as necessary to prevent overfilling.
Keep communication open with the loading control room or supervisor.
Observe for any leaks or irregularities during the loading process.
Post-Loading Procedures
Once loading is complete, close all valves on the loading arm and tanker.
Disconnect the loading arm safely and securely.
Conduct a final inspection of the loading area for spills or leaks.
Complete all necessary documentation and report any incidents or issues.
Clean-Up and Reporting
Clean any spills or leaks immediately following safety protocols.
Return all equipment and hoses to their designated storage areas.
Submit the completed checklist and any reports to the supervisor.
Conduct a debriefing session if necessary to discuss any issues encountered during the loading process.
Download CSV
Download JSON
Download Markdown
Use in Manifestly