Software Requirement Specification (SRS) Project Title: Samgra EKYC-Based Verification Process for P

1. API Integration

  • Gather input from both teams.
  • Identify data flow and interaction points.
  • Document specific API functionalities required.
  • Ensure clarity on expected outcomes.
  • Review and finalize the requirements collaboratively.
  • Determine format standards (JSON, XML, etc.).
  • Define data structure and schema.
  • Ensure compatibility with both systems.
  • Document transformation rules if needed.
  • Review with stakeholders for approval.
  • Identify necessary security protocols (HTTPS, OAuth, etc.).
  • Document encryption methods for data in transit.
  • Specify authentication mechanisms for API access.
  • Outline measures against common vulnerabilities.
  • Ensure compliance with industry standards.
  • List all API endpoints with descriptions.
  • Specify HTTP methods for each endpoint.
  • Document required parameters and headers.
  • Include example requests and responses.
  • Ensure endpoints are versioned appropriately.
  • Define a versioning format (e.g., v1, v2).
  • Document how versions will be managed.
  • Specify deprecation timelines for old versions.
  • Ensure backward compatibility considerations.
  • Communicate versioning strategy to stakeholders.
  • Identify authentication methods (API keys, tokens).
  • Define user roles and permissions.
  • Document the process for token issuance.
  • Specify endpoint access controls.
  • Review security measures with stakeholders.
  • Determine acceptable usage limits.
  • Document response strategies for rate limits.
  • Specify how throttling will be implemented.
  • Include monitoring methods for usage.
  • Review with development and operations teams.
  • Document standard HTTP response codes.
  • Specify custom error messages for clarity.
  • Outline handling procedures for common errors.
  • Define fallback mechanisms for failures.
  • Review with QA and development teams.
  • Define testing frameworks and tools to be used.
  • Specify unit test coverage requirements.
  • Outline integration testing scenarios.
  • Document performance testing criteria.
  • Ensure testing strategy aligns with deployment.
  • Identify key metrics to be logged.
  • Specify logging levels (info, error, debug).
  • Document storage and retention policies.
  • Outline monitoring tools and alerts.
  • Review logging practices with security teams.
  • List all third-party APIs used.
  • Document their functionalities and versions.
  • Specify fallback strategies for dependencies.
  • Identify support and maintenance contacts.
  • Review impact on overall system performance.
  • Define acceptable response times for endpoints.
  • Specify throughput and load handling capabilities.
  • Document performance testing criteria.
  • Identify benchmarks for future assessments.
  • Ensure alignment with overall system performance.
  • Document steps for reverting to previous states.
  • Identify triggers for rollback actions.
  • Specify data integrity checks post-rollback.
  • Outline communication protocols for failures.
  • Review rollback procedures with the team.
  • Create detailed API documentation.
  • Include usage examples and best practices.
  • Document version history and updates.
  • Ensure accessibility for all developers.
  • Solicit feedback for continuous improvement.
  • Document deprecation timelines and processes.
  • Specify communication strategies for changes.
  • Ensure backward compatibility during updates.
  • Outline testing requirements for new versions.
  • Review with stakeholders for approval.
  • Identify relevant compliance standards (GDPR, etc.).
  • Document data handling and storage policies.
  • Ensure all team members are aware of regulations.
  • Review compliance documentation regularly.
  • Consult legal teams for guidance.
  • Define key stakeholders and their information needs.
  • Establish regular update schedules.
  • Determine communication channels (email, meetings).
  • Document critical milestones and timelines.
  • Gather feedback to improve communication.

2. Wallet Management

  • Define wallet purpose and functionality.
  • Specify user authentication methods.
  • Outline transaction types supported.
  • Include compliance requirements.
  • Describe recharge triggers and conditions.
  • Identify user settings for auto recharge.
  • Outline notification process for recharges.
  • List conditions for triggering auto recharge.
  • Define minimum and maximum recharge limits.
  • Specify user control over limits.
  • Provide options for manual recharge methods.
  • Detail user interface for manual recharges.
  • Outline confirmation process for recharges.
  • List accepted payment methods (e.g., credit card, bank transfer).
  • Specify integration requirements for payment gateways.
  • Outline user experience for selecting methods.
  • Design layout for wallet balance display.
  • Include filters for transaction history.
  • Ensure accessibility features are present.
  • Identify encryption methods for data protection.
  • Outline two-factor authentication processes.
  • Specify monitoring for suspicious activities.
  • Define maximum allowable wallet balance.
  • Specify user notification for reaching limits.
  • Outline procedures for limit changes.
  • Detail withdrawal request process.
  • Specify user verification steps.
  • Outline processing times for withdrawals.
  • Define threshold for low balance alerts.
  • Specify notification methods (e.g., SMS, email).
  • Outline user settings for notification preferences.
  • List all applicable transaction fees.
  • Specify conditions for fee waivers.
  • Outline user notification regarding fees.
  • Define failure scenarios and user notifications.
  • Outline resolution steps for failed transactions.
  • Specify escalation procedures for unresolved issues.
  • Detail identity verification methods for recovery.
  • Outline steps for resetting credentials.
  • Specify user support contact information.
  • Define reconciliation frequency and procedures.
  • Outline roles responsible for reconciliation.
  • Specify reporting requirements for discrepancies.
  • List required reports and their frequency.
  • Specify format and distribution of reports.
  • Outline compliance requirements for reporting.

3. Transaction Testing

4. Reporting Requirements

  • Confirm receipt of the format.
  • Review the format for completeness.
  • Document any discrepancies or issues.
  • Seek clarification from the department if needed.
  • List all required data elements.
  • Define metrics for measurement.
  • Ensure alignment with project goals.
  • Consult stakeholders for input.
  • Confirm receipt of the format.
  • Review the format for completeness.
  • Document any discrepancies or issues.
  • Seek clarification from the department if needed.
  • List all required data elements.
  • Define metrics for measurement.
  • Ensure alignment with project goals.
  • Consult stakeholders for input.
  • Determine how often reports are needed.
  • Create a timetable for report generation.
  • Communicate schedule to all stakeholders.
  • Adjust frequency based on feedback.
  • Identify key personnel for reporting.
  • Assign roles and responsibilities clearly.
  • Ensure team has necessary skills.
  • Document contact information for coordination.
  • Design initial report templates.
  • Seek feedback from stakeholders.
  • Revise templates based on input.
  • Obtain final approval before use.
  • Research available reporting tools.
  • Evaluate tools against project needs.
  • Conduct trials if necessary.
  • Document validation results.
  • Identify all data sources.
  • Verify data availability and quality.
  • Establish data access protocols.
  • Document any limitations or concerns.
  • Define validation criteria.
  • Implement data verification processes.
  • Document findings and corrections.
  • Review validation results with stakeholders.
  • List all relevant stakeholders.
  • Conduct interviews or surveys for input.
  • Document specific reporting needs.
  • Ensure all voices are heard.
  • Define distribution list for reports.
  • Establish access control protocols.
  • Communicate distribution procedures.
  • Review access controls for compliance.
  • Identify key performance indicators.
  • Define success criteria for reports.
  • Align metrics with project objectives.
  • Document and communicate criteria clearly.
  • Establish a feedback collection process.
  • Define revision protocols.
  • Document and track feedback received.
  • Ensure timely updates to reports.

5. User Acceptance Testing (UAT)

  • Confirm the UAT schedule with all relevant departments.
  • Document the date and time for the scheduled UAT.
  • Ensure all participants are notified about the schedule.
  • Define clear acceptance criteria for UAT.
  • Establish methods for collecting feedback from participants.
  • Ensure all stakeholders agree on criteria and feedback processes.
  • Create detailed test cases based on requirements.
  • Ensure all test cases are reviewed by stakeholders.
  • Document the test cases for reference during UAT.
  • Prepare the UAT environment to mirror production.
  • Configure necessary software and hardware components.
  • Verify the environment's readiness with stakeholders.
  • List all key stakeholders and potential end-users.
  • Confirm their availability and willingness to participate.
  • Communicate the importance of their involvement.
  • Schedule training sessions for all users.
  • Provide materials and resources for training.
  • Collect feedback on the training effectiveness.
  • Share the UAT schedule with all participants.
  • Include details on timing, location, and format.
  • Confirm receipt of the schedule with all stakeholders.
  • Select appropriate tools for issue tracking.
  • Ensure all participants have access to these tools.
  • Train participants on how to use the tools effectively.
  • Identify potential risks that may arise during UAT.
  • Develop and document contingency plans for each risk.
  • Communicate the plans to all UAT participants.
  • Create realistic test data for UAT.
  • Ensure data scenarios cover all acceptance criteria.
  • Review test data with stakeholders for accuracy.
  • Draft a sign-off document outlining UAT details.
  • Require all participants to acknowledge understanding.
  • Keep signed documents for future reference.
  • Establish a method for collecting feedback.
  • Define criteria for prioritizing feedback issues.
  • Communicate the process to all UAT participants.
  • Schedule regular meetings to discuss UAT progress.
  • Ensure all key stakeholders can attend these meetings.
  • Document discussions and decisions made during meetings.
  • Develop a plan for issue resolution and retesting.
  • Assign responsibilities for addressing identified issues.
  • Communicate the plan to all relevant stakeholders.
  • Define specific criteria for UAT completion.
  • Ensure agreement on criteria from all stakeholders.
  • Document the agreed-upon criteria for reference.
  • Schedule a meeting for after UAT completion.
  • Prepare an agenda focusing on UAT results.
  • Ensure all key stakeholders are invited to the meeting.

6. Dry Run Procedures

  • Confirm the dry run date and time with the department.
  • Ensure all department members are informed and available.
  • Document confirmation of planning in project records.
  • Identify key participants and their roles.
  • Assign responsibilities for each component of the dry run.
  • Communicate roles clearly to all stakeholders.
  • Identify all stakeholders involved in the process.
  • Propose multiple dates and times for the session.
  • Send calendar invites to all participants.
  • List all components involved in the process.
  • Detail functionalities to be validated during the dry run.
  • Distribute the checklist to stakeholders for review.
  • Verify hardware setups are in place.
  • Check software installations and configurations.
  • Test network connectivity and performance.
  • Set an agenda focusing on objectives and expectations.
  • Encourage participants to ask questions for clarity.
  • Summarize key points and confirm understanding.
  • Follow the checklist to ensure all scenarios are covered.
  • Monitor adherence to the defined use cases.
  • Record any deviations from the expected process.
  • Assign team members to observe system performance.
  • Document any unexpected behaviors or errors.
  • Communicate issues to the team immediately.
  • Distribute feedback forms for participants to fill.
  • Encourage open discussion about experiences.
  • Compile feedback for analysis post-session.
  • Create a log of all identified issues.
  • Categorize issues by severity and impact.
  • Ensure documentation is clear and detailed.
  • Schedule a meeting shortly after the dry run.
  • Discuss feedback and issues with all stakeholders.
  • Prioritize issues for resolution.
  • Identify areas for improvement from feedback.
  • Implement changes to the process or system.
  • Communicate changes to all relevant stakeholders.
  • Create a timeline for issue resolution.
  • Assign ownership of unresolved issues.
  • Schedule regular check-ins to monitor progress.
  • Review all documentation for completeness.
  • Ensure documents are stored in a shared location.
  • Notify stakeholders of document availability.

7. Consent Form Preparation

  • Confirm documentation exists.
  • Ensure it is accessible to the team.
  • Check for any updates needed.
  • Review the outline for completeness.
  • Verify alignment with project objectives.
  • Ensure key topics are included.
  • Research applicable laws and regulations.
  • Summarize key compliance requirements.
  • Document findings for reference.
  • List key stakeholders involved.
  • Assign roles and responsibilities.
  • Ensure all relevant parties are included.
  • Create a draft using the outline.
  • Focus on clarity and conciseness.
  • Incorporate all required elements.
  • Detail data collection methods.
  • Explain privacy policies clearly.
  • Outline user rights explicitly.
  • Select a suitable date and time.
  • Send calendar invites to stakeholders.
  • Prepare discussion points and agenda.
  • Collect feedback from the meeting.
  • Incorporate necessary revisions.
  • Ensure legal compliance is maintained.
  • Use simple language and terminology.
  • Avoid jargon and complex phrases.
  • Consider readability and layout.
  • Identify languages needed based on users.
  • Engage translators for accuracy.
  • Ensure clarity in all versions.
  • Cross-check with legal requirements.
  • Verify alignment with project goals.
  • Make final adjustments as necessary.
  • Present the final draft for approval.
  • Document approval process.
  • Follow up with stakeholders as needed.
  • Identify distribution channels.
  • Create a timeline for distribution.
  • Ensure accessibility for all users.
  • Define metrics for completion tracking.
  • Implement a feedback mechanism.
  • Record data for analysis.
  • Set a review schedule.
  • Assign responsibilities for updates.
  • Document any changes made.

8. Kiosk Identification

  • Review consent form requirements.
  • Identify key criteria for kiosk selection.
  • Align criteria with legal and regulatory standards.
  • Document criteria for clarity and compliance.
  • Outline the steps for kiosk verification.
  • Specify roles involved in the approval process.
  • Document required approvals and timelines.
  • Ensure accessibility for updates and reviews.
  • Research target demographics and locations.
  • Analyze foot traffic and accessibility data.
  • Map potential kiosk deployment areas.
  • Document geographic criteria for selection.
  • Identify high-traffic areas for maximum visibility.
  • Evaluate accessibility for all user types.
  • Consider proximity to relevant services.
  • Create a scoring system for potential locations.
  • Determine user interaction needs.
  • Specify minimum hardware requirements.
  • Include details on durability and maintenance.
  • Document compatibility with software solutions.
  • Analyze expected user traffic data.
  • Calculate kiosk-to-user ratio for efficiency.
  • Consider peak usage times and patterns.
  • Document findings and recommendations.
  • List all required hardware components.
  • Include power supply specifications.
  • Document network connectivity requirements.
  • Create a step-by-step setup procedure.
  • Establish a monitoring schedule.
  • Identify key performance indicators (KPIs).
  • Document maintenance procedures and responsibilities.
  • Set up a reporting system for issues.
  • Identify necessary skills for kiosk management.
  • Develop training materials and sessions.
  • Establish evaluation methods for staff competency.
  • Document ongoing training needs and updates.
  • Identify potential security risks.
  • Document security protocols and measures.
  • Include physical and software security requirements.
  • Establish incident response procedures.
  • Create a user-friendly feedback interface.
  • Document methods for collecting feedback.
  • Establish a response protocol for issues.
  • Analyze feedback for continuous improvement.
  • Identify key milestones in the deployment process.
  • Estimate timeframes for each phase.
  • Document dependencies and resources needed.
  • Communicate the timeline to stakeholders.
  • Outline steps for issue identification.
  • Specify escalation paths and responsible parties.
  • Document timelines for resolution.
  • Ensure clarity on communication channels.

9. Verification Process

  • Document the verification process steps.
  • Define roles and responsibilities for each level.
  • Ensure alignment with MPEB department objectives.
  • Review with stakeholders for approval.
  • Identify key personnel for each verification level.
  • Outline responsibilities for each role.
  • Ensure clear communication of roles.
  • Update documentation as needed.
  • Document the verification process steps.
  • Define roles and responsibilities for each level.
  • Ensure alignment with MPEB department objectives.
  • Review with stakeholders for approval.
  • Identify key personnel for each verification level.
  • Outline responsibilities for each role.
  • Ensure clear communication of roles.
  • Update documentation as needed.
  • Define criteria for successful verification.
  • Document guidelines for consistency.
  • Ensure guidelines align with regulatory requirements.
  • Review with stakeholders for validation.
  • Select a logging tool or software.
  • Define data fields for logging results.
  • Train personnel on logging process.
  • Ensure secure storage of logs.
  • Research tools suitable for verification needs.
  • Evaluate compatibility with existing systems.
  • Document tool functionalities and costs.
  • Obtain necessary approvals for tool usage.
  • Identify training needs for personnel.
  • Develop a training schedule and materials.
  • Assign trainers with relevant expertise.
  • Evaluate training effectiveness post-completion.
  • Create comprehensive test cases for verification.
  • Ensure coverage of all verification scenarios.
  • Review test cases with stakeholders.
  • Update based on feedback received.
  • Define steps for issue identification.
  • Establish a reporting mechanism for discrepancies.
  • Document resolution processes.
  • Communicate the protocol to all personnel.
  • Identify key performance indicators (KPIs).
  • Define measurement methods for each KPI.
  • Document performance evaluation criteria.
  • Review metrics periodically for relevance.
  • Create a system for collecting feedback.
  • Schedule regular review meetings.
  • Document suggestions for improvements.
  • Implement changes based on feedback.
  • Outline expected timeframes for each verification stage.
  • Discuss and agree upon timelines with stakeholders.
  • Document timelines in project plan.
  • Monitor adherence to timelines.
  • Identify potential failure scenarios.
  • Develop response strategies for each scenario.
  • Document the contingency plan clearly.
  • Train personnel on execution of the plan.
  • Research relevant compliance and regulatory standards.
  • Document requirements in the SRS.
  • Review documentation with legal advisors.
  • Update as regulations change.
  • Define audit frequency and scope.
  • Assign audit responsibilities to individuals.
  • Document audit findings and action plans.
  • Review audits to improve processes.
  • Create a communication plan for stakeholders.
  • Schedule regular update meetings.
  • Provide avenues for stakeholder feedback.
  • Document engagement activities.

10. Non-Functional Requirements

11. Documentation and Review

  • Identify key stakeholders involved.
  • Schedule a review meeting.
  • Gather feedback and suggestions.
  • Document feedback for future reference.
  • Ensure all concerns are addressed.
  • Select a version control system.
  • Establish naming conventions for versions.
  • Document version history and changes.
  • Train team members on versioning practices.
  • Regularly back up the document.
  • Implement a change tracking system.
  • Log each change with details.
  • Review changes periodically.
  • Ensure changes are communicated to stakeholders.
  • Archive outdated versions for reference.
  • Define the sign-off criteria.
  • Identify individuals responsible for sign-off.
  • Document the sign-off process.
  • Schedule sign-off meetings.
  • Record sign-off approvals for accountability.
  • Research applicable standards and regulations.
  • Create a compliance checklist.
  • Review the SRS against the checklist.
  • Document areas of non-compliance.
  • Update the checklist as needed.
  • Compile a list of relevant stakeholders.
  • Distribute the SRS document for feedback.
  • Set a deadline for feedback submission.
  • Analyze and categorize feedback received.
  • Incorporate feedback into the document.
  • Identify all terms and acronyms used.
  • Create a glossary section in the SRS.
  • Define each term clearly and concisely.
  • Ensure glossary is reviewed and approved.
  • Update glossary as new terms arise.
  • Establish a schedule for regular updates.
  • Define roles and responsibilities for updates.
  • Document procedures for making updates.
  • Communicate update schedules to stakeholders.
  • Review updates for accuracy and relevance.
  • Gather all existing related documentation.
  • Conduct a side-by-side review.
  • Highlight inconsistencies and discrepancies.
  • Document findings and proposed changes.
  • Ensure alignment with project objectives.
  • Develop a standard format guideline.
  • Ensure all team members are trained.
  • Review the SRS document for adherence.
  • Document any deviations with justifications.
  • Update guidelines as necessary.
  • Conduct a risk assessment session.
  • Identify potential risks impacting the SRS.
  • Document risks with descriptions and impacts.
  • Assign ownership for each identified risk.
  • Review and update risks regularly.
  • Establish a change request procedure.
  • Document the steps for submitting requests.
  • Review and evaluate each request.
  • Communicate decisions to stakeholders.
  • Track the implementation of approved changes.
  • Analyze requirements to identify test cases.
  • Document each test case with details.
  • Review test cases for completeness and relevance.
  • Ensure test cases are traceable to requirements.
  • Update test cases as requirements evolve.
  • Record decisions during review meetings.
  • Summarize key points and rationale.
  • Distribute the summary to stakeholders.
  • Store the summary in a central repository.
  • Review decisions for any necessary follow-ups.
  • Define maintenance objectives and scope.
  • Schedule regular review intervals.
  • Assign responsibilities for updates.
  • Document the maintenance plan clearly.
  • Communicate the plan to all stakeholders.

12. Finalization

  • Gather approvals from all stakeholders.
  • Ensure all signatures are collected.
  • Confirm document is accessible to all parties.
  • Maintain a record of approvals for future reference.
  • Review change request logs.
  • Verify that all requested changes are implemented.
  • Conduct a final comparison of versions.
  • Update document version number accordingly.
  • Distribute the final document to all stakeholders.
  • Set a deadline for feedback submission.
  • Collect and review all feedback received.
  • Make necessary adjustments based on feedback.
  • Prepare a sign-off sheet for stakeholders.
  • Schedule a meeting to discuss the SRS.
  • Collect formal signatures as proof of acceptance.
  • File the signed document for future reference.
  • Compile a list of identified risks.
  • Detail mitigation strategies for each risk.
  • Review with stakeholders for feedback.
  • Ensure inclusion in the final document.
  • Develop a maintenance schedule.
  • Assign team members responsible for updates.
  • Define processes for documenting changes.
  • Communicate the plan to all relevant personnel.
  • Review regulatory requirements applicable to the project.
  • Ensure compliance criteria are met.
  • Document compliance checks within the SRS.
  • Obtain necessary confirmations from compliance teams.
  • Draft a communication plan outlining details.
  • Identify all team members who will receive the SRS.
  • Choose appropriate communication channels.
  • Schedule a briefing session to explain the SRS.
  • Create a comprehensive list of references.
  • Ensure all citations are accurate and complete.
  • Attach supporting documents as appendices.
  • Review for consistency in formatting.
  • Establish a change tracking system.
  • Document every change with reasons and dates.
  • Assign responsibility for maintaining the change log.
  • Review the process periodically for updates.
  • Compile a list of glossary terms.
  • Review definitions with subject matter experts.
  • Ensure clarity and conciseness in language.
  • Incorporate feedback into the final SRS.
  • Select a version control tool suitable for documentation.
  • Train team members on the system's use.
  • Establish guidelines for versioning documents.
  • Regularly back up SRS versions for safety.
  • Review all feedback collected from past reviews.
  • Document actions taken in response to feedback.
  • Ensure transparency in addressing concerns.
  • Share updates with stakeholders to maintain alignment.
  • Compile a list of key decisions made.
  • Summarize the rationale behind each decision.
  • Include summaries in the final document.
  • Ensure clarity for future reference.

Related Checklists