tank commissioning checklist

1. Pre-Commissioning Inspection

2. Mechanical Integrity Checks

3. Safety and Environmental Compliance

4. Functional Testing

  • Fill the tank with water to the specified test pressure.
  • Observe joints, fittings, and seams for any signs of leakage.
  • Maintain pressure for the required duration as per standards.
  • Document any leaks or pressure drops observed during the test.
  • Open fill and discharge valves to ensure proper operation.
  • Check for any obstructions or blockages in the lines.
  • Monitor flow rates to confirm they meet design specifications.
  • Ensure all systems return to a safe state post-testing.
  • Calibrate level sensors according to manufacturer guidelines.
  • Compare readings from the instrument with a manual measurement.
  • Check for consistency across different tank levels.
  • Document any discrepancies and adjust calibration as necessary.
  • Simulate emergency conditions to test shut-off response.
  • Verify that all safety alarms and indicators activate correctly.
  • Inspect shut-off valves for mechanical integrity and functionality.
  • Conduct tests at various operational levels to ensure reliability.
  • Create a vacuum in the tank to the specified level.
  • Monitor for pressure changes indicating leaks over time.
  • Inspect all seals, joints, and connections for integrity.
  • Document results and take corrective actions if necessary.

5. Documentation and Reporting

  • Gather all reports from inspections and tests conducted.
  • Organize reports in chronological order.
  • Ensure all documents are signed and dated.
  • Create a summary document outlining key findings.
  • Store reports in a designated electronic folder.
  • Review original drawings against completed work.
  • Make necessary revisions to reflect actual installations.
  • Add notes or annotations for clarity.
  • Ensure all changes are documented and approved.
  • Save the updated drawings in the project’s records.
  • Check for required compliance certificates for all equipment.
  • Verify the validity and expiration dates of each certificate.
  • Ensure certificates are signed by authorized personnel.
  • Compile certificates into a single compliance file.
  • Store the file in an accessible location for audits.
  • Draft a report summarizing the commissioning process.
  • Include findings, issues encountered, and resolutions.
  • Attach relevant documentation as appendices.
  • Ensure clarity and completeness for stakeholder review.
  • Submit the report to project management for approval.
  • Identify all stakeholders requiring documentation.
  • Compile a distribution list with contact details.
  • Send documents via email or shared drive.
  • Confirm receipt of documents with stakeholders.
  • Maintain a record of distributed documentation.

6. Final Review and Handover