Your checklists (
0
)
AI Checklist Generator
From the makers of
Manifestly Checklists
Sign in
Email address
Email me a magic link
Home
> temperature transmitter PM checklist
temperature transmitter PM checklist
1. Visual Inspection
Check for physical damage to the transmitter housing.
Inspect wiring and connections for signs of wear or corrosion.
Ensure that the transmitter is securely mounted.
Verify that there are no leaks or signs of moisture ingress.
2. Functional Testing
Confirm that the transmitter is powered on and functioning.
Compare the output signal with a calibrated reference source.
Check for proper response time to temperature changes.
Test the transmitter’s alarm functions, if applicable.
3. Calibration Check
Verify the calibration date and determine if recalibration is due.
Perform a zero and span check according to the manufacturer's specifications.
Document any calibration adjustments made during the check.
Confirm that calibration certificates are up-to-date and accessible.
4. Maintenance Tasks
Clean any dust or debris from the transmitter and surrounding area.
Tighten any loose connections or mounting hardware.
Replace any worn or damaged seals or gaskets.
Update maintenance logs and records as necessary.
5. Documentation and Reporting
Record all findings and actions taken during the PM check.
Report any issues or necessary repairs to the maintenance team.
Ensure that all documentation is filed properly for future reference.
Schedule the next PM check based on manufacturer recommendations or facility guidelines.
Download CSV
Download JSON
Download Markdown
Use in Manifestly