1. PRE-INSTALLATION CHECKS
Review the manufacturer's installation manual for specific requirements.
Confirm that the required tools and materials are available for installation.
Ensure that environmental conditions (temperature, humidity) are within acceptable limits for installation.
Verify compatibility with existing systems (e.g., control systems, display units).
Check for any local codes or regulations that must be followed during installation.
2. INSTALLATION PROCEDURE
Prepare the mounting surface and ensure it is clean and free of obstructions.
Install the temperature transmitter according to the manufacturer’s guidelines.
Ensure that thermal insulation, if required, is properly fitted around the sensor.
Connect the wiring securely, ensuring polarity is observed where applicable.
Perform a final inspection of the installation to ensure all components are correctly positioned.
3. INITIAL POWER-UP
Apply power to the temperature transmitter and check for proper startup indicators (LEDs, display).
Verify that the transmitter initializes without errors or alarms.
Confirm that the transmitter is communicating with the control system (if applicable).
Check for any abnormal sounds or signals during startup.
4. FUNCTIONAL VERIFICATION
Use a calibrated reference temperature source to simulate input conditions.
Verify that the output signal from the transmitter matches the expected values for simulated inputs.
Check the response time of the transmitter to changes in temperature input.
Ensure that the transmitter operates within specified accuracy limits.
5. DOCUMENTATION
Record all installation parameters, including location, settings, and serial numbers.
Update system documentation with the new transmitter configuration and calibration details.
Create a maintenance schedule based on manufacturer recommendations and operational needs.
Document any deviations or special considerations noted during installation and testing.
6. POST-INSTALLATION REVIEW
Conduct a final walkthrough with stakeholders to ensure satisfaction with installation.
Review the performance data with the team to confirm expected operation.
Gather feedback from operators on the usability of the transmitter and interface.
Schedule follow-up checks to confirm continued performance and reliability.