Testing of Power Failure Scenario

Preparation Phase

Pre-Test Configuration

  • Identify potential hazards related to power failure.
  • Evaluate the impact of power loss on systems and operations.
  • Document all findings in a risk assessment report.
  • Share the report with relevant stakeholders for review.
  • Access logging settings in each critical system.
  • Ensure detailed logging is activated for all relevant parameters.
  • Check storage capacity for logs to prevent overflow.
  • Test log retrieval to confirm functionality.
  • Duplicate hardware configurations from the production environment.
  • Replicate software versions and settings used in production.
  • Ensure network configurations match those of production.
  • Document any deviations from the production setup.
  • Identify all redundancy systems in use, such as UPS.
  • Schedule a time to safely disable these systems.
  • Document the status of redundancy systems before disabling.
  • Notify all relevant personnel of the change in configuration.

Testing Procedure

Recovery Phase

Post-Test Review

Follow-Up Actions