Your checklists (
0
)
AI Checklist Generator
From the makers of
Manifestly Checklists
Sign in
Email address
Email me a magic link
Home
> Unit heater commissioning pre functional checklist
Unit heater commissioning pre functional checklist
Electrical
Verify proper voltage supply to unit heater
Check all electrical connections for tightness
Ensure all electrical components are properly grounded
Inspect wiring for any signs of damage or wear
Test all safety switches and controls for proper operation
Verify that all electrical panels and covers are securely in place
Confirm that the unit heater is connected to a dedicated circuit with the appropriate amperage
Check for any exposed or loose wires that could pose a safety hazard
Gas
Inspect gas line for leaks
Verify proper gas pressure
Check gas valve operation
Ensure proper gas piping size and configuration
Confirm gas shut-off valve is easily accessible and functional
Test gas igniter for proper operation
Check for proper gas combustion and exhaust ventilation
Ventilation
Verify proper ventilation for combustion gases
Inspect exhaust vent for obstructions
Check combustion air intake for proper flow
Ensure proper clearance around the exhaust vent
Verify that the combustion air intake is not blocked by debris
Check for any signs of backdrafting or improper ventilation
Test the operation of any ventilation fans or dampers connected to the unit heater
Confirm that the ventilation system meets local building codes and standards
Controls
Test thermostat operation
Verify proper sequencing of unit heater components
Check safety switches for proper operation
Verify proper communication between thermostat and unit heater
Test emergency shut-off switch functionality
Ensure proper set-up of timer or scheduling functions
Check for any error codes or malfunctions in control panel
Verify that unit heater responds correctly to temperature adjustments on thermostat
Test remote control functionality (if applicable)
Airflow
Inspect air filters for cleanliness
Verify proper airflow through unit heater
Check blower motor operation
Check for any obstructions or blockages in the airflow path
Measure and record the static pressure of the airflow
Verify that the air distribution pattern is even and reaches all areas of the space
Inspect and clean any dampers or louvers in the airflow system
Check for any leaks or gaps in the ductwork that could affect airflow
Verify that the airflow is within the manufacturer's recommended range
General
Inspect unit heater for any physical damage
Ensure all access panels are secure
Verify proper clearances around unit heater for safe operation.
Check for any loose or missing screws or bolts on the unit heater
Verify that the unit heater is level and stable
Inspect the unit heater for any signs of corrosion or rust
Ensure that the unit heater is properly grounded
Check for any obstructions or debris blocking airflow to the unit heater
Download CSV
Download JSON
Download Markdown
Use in Manifestly