visual inspection for milled asphalt and base coarse to use as improved subbase based on BS

1. Preliminary Assessment

2. Material Condition

3. Thickness and Uniformity

4. Drainage and Moisture Control

5. Compaction and Stability

6. Joint and Edge Conditions

7. Compliance with Standards

  • Review applicable British Standards for milled asphalt and base course.
  • Compare visual inspection results against standard criteria.
  • Identify any discrepancies between findings and standards.
  • Consult with team for clarification on standards if needed.
  • Record specific details of each deviation observed.
  • Include location, nature, and severity of non-compliance.
  • Use standardized forms for consistency.
  • Notify relevant stakeholders of non-compliance.
  • Utilize a structured format for recording results.
  • Double-check entries for accuracy before finalizing.
  • Ensure all team members use the same recording method.
  • Store records securely for future reference and audits.

8. Recommendations and Action Items

9. Final Review

Related Checklists