WATER COOLING SYSTEM
1. PRE-OPERATIONAL CHECKS
Verify that the water supply is connected and functional.
Check for any visible leaks in the system.
Inspect the cooling tower for debris and clean as necessary.
Ensure that all valves are in the correct position.
Confirm that the pump is operational and free of unusual noises.
2. OPERATIONAL MONITORING
Monitor water temperature at the inlet and outlet.
Check the flow rate to ensure it meets system specifications.
Observe pressure gauges for normal operation ranges.
Listen for any unusual sounds from the pump or cooling tower.
Verify that the chemical treatment levels are within recommended limits.
3. MAINTENANCE TASKS
Clean or replace filters as needed.
Inspect and clean heat exchangers regularly.
Check and tighten all fittings and connections.
Lubricate moving parts such as pump bearings and fan motors.
Schedule periodic checks for scaling and corrosion.
4. SAFETY PROTOCOLS
Ensure that all safety guards and covers are in place.
Review emergency shut-off procedures with staff.
Confirm that safety equipment (e.g., goggles, gloves) is available.
Conduct a walk-through to identify potential hazards.
Document any safety incidents or near-misses for review.
5. POST-OPERATIONAL TASKS
Drain and clean the system as per the maintenance schedule.
Inspect for any signs of wear or damage after operation.
Record operational data for future reference and analysis.
Review system performance against benchmarks.
Plan for any necessary repairs or upgrades based on findings.